Home

Install

Garage Drywall InstallationBasement Drywall InstallationDrywall Installation

Finish

Drywall Taping & MuddingDrywall Finishing

Repair

Drywall PatchingWater-Damaged Drywall RepairCeiling Drywall RepairDrywall Repair

Specialty

Commercial Drywall ServicesResidential Drywall ServicesPopcorn Ceiling Removal

More

All servicesTimelinesFAQGet a free estimate

Popcorn ceiling removal in Menomonee Falls

It is a dirty job. We contain it, do it, and leave you a flat ceiling.

Get a free estimate
Scraper lifting popcorn texture off a ceiling in wide strips

The short of it

Popcorn ceilings were a shortcut. Spray texture over a ceiling and you do not have to finish the joints properly. Builders loved it. Fifty years later, homeowners do not.

Taking it down is not hard to understand. Wet it, scrape it, fix what is underneath. It is just messy and slow, and the fixing part takes skill. That is the part people underestimate.

The work, plainly

Removal is the first third of the job. We cover the room in plastic, soak the texture and scrape it off. If the popcorn was painted, it fights back and takes longer.

The other two thirds is finishing the ceiling. Under the texture you will find tape lines, screw heads and scraper marks. We re-tape what is loose, coat the joints, then skim the whole ceiling two or three times until it is flat.

Why now

  • You are painting

    Ceilings go first.

  • There is a stain or patch

    It will never blend into popcorn.

  • You are selling

    It dates the house on sight.

  • It is coming loose

    Flakes mean the bond is gone.

Order of work

  1. Test

    Lab test for asbestos on older texture.

  2. Cover

    Floors, walls and fixtures in plastic.

  3. Scrape

    Wet and remove.

  4. Repair and skim

    Fix joints, then coat the full ceiling.

  5. Sand and clear

    Dust-controlled sanding. Plastic and debris out.

The asbestos question

Texture sprayed before the late 1980s may contain asbestos. There is no way to tell without a lab. The test is cheap and takes a few days. We do not scrape until we have the result.

If it is positive, there are two ways forward. Licensed abatement removes it. Or we leave it alone and screw a new layer of thin drywall over the top, then finish that. The second option is often simpler and you still get a smooth ceiling.

What you gain

  • A brighter room

    Flat ceilings reflect light.

  • A cleaner one

    Nothing for dust to cling to.

  • Easy maintenance

    Paint it with a roller.

  • A current look

    The 1970s leave the building.

What the estimate lists

Popcorn removal has more parts than people expect. The estimate breaks them out.

  • Testing

    Whether a lab test for asbestos has been done. For texture from before the mid-1980s we need a result before we scrape. The estimate notes who is arranging it.

  • Protection

    Plastic on floors and walls, masking on fixtures and vents. This is a large share of the labor on a popcorn job.

  • Removal method

    Scrape, skim over, or cover with new board. The method depends on whether the texture is painted and what the test shows.

  • Ceiling repair

    Re-taping and coating the joints that the texture was hiding. Almost every ceiling needs some.

  • Finish

    Smooth and ready for primer, or a light new texture. Named in the estimate.

  • Disposal

    Bagging and removal of the scraped material and the plastic.

How the days run

For two or three rooms on one floor.

  1. Day one: protect and scrape

    Rooms are emptied or wrapped. Floors and walls are covered. The air handler is shut off for the area. Texture is dampened in sections and scraped. Debris is bagged as we go.

  2. Day two: repair

    With the ceiling bare, bad tape is cut out and replaced. Gouges are filled. Torn paper is sealed. First skim coat goes on.

  3. Day three: second coat

    A full second pass to level the surface.

  4. Day four: sand and check

    Sanded with vacuum tools. Checked with a light held along the ceiling. Touch-ups done.

  5. Day five: clear out

    Plastic removed with the debris inside. Floors vacuumed. Fixtures back up.

A single small room can be done faster. Painted texture adds a day, sometimes two. We tell you which you have after a test scrape during the estimate.

What we need from you

A test result, if the house was built before the mid-1980s and the ceiling has not been tested. Sprayed texture from that period can contain asbestos. A lab test on a small sample is the only way to know. We do not scrape untested texture of that age.

Empty rooms, as far as you can manage. Scraping drops wet texture over the whole floor area. Anything left in the room has to be wrapped completely, and that takes time you are paying for. Closets with popcorn ceilings need emptying too.

A decision on the fixtures. Ceiling lights and fans come down or get masked. If you plan to replace them, or add recessed lights, schedule the electrician before we skim. Cutting into a finished ceiling afterward means a patch.

Somewhere else to be. The rooms are out of use for the length of the job. If bedrooms are involved, plan to sleep in another part of the house.

What can change the plan

Paint on the texture. One coat slows the scrape. Several coats can stop it. If a test area will not release, we switch to skimming over the texture or covering it with new board, and we tell you the price difference before we do.

The board underneath. Sometimes the scrape reveals ceilings that were never properly taped, or old water damage that the texture was hiding. Bad sections get repaired or replaced. If it is more than the estimate allowed for, you hear about it before we proceed.

A positive test. If the texture contains asbestos, we do not remove it. A licensed abatement contractor can. The other route is to leave it in place and fasten new thin board over it, which we can do.

Height. Vaulted and two-story ceilings need scaffold and add time to every stage.

Mistakes we see on popcorn jobs

  • Scraping dry

    It makes dust and tears the paper face of the board. The texture should be damp.

  • Soaking the ceiling

    Too much water loosens the joint tape and softens the board. Light, even wetting in sections.

  • Painting right after the scrape

    A scraped ceiling shows every seam. It needs skim coats and sanding first.

  • Skipping the test

    Not worth the risk on older texture.

After we leave

Prime the whole ceiling with a drywall primer. Then two coats of flat ceiling paint. Flat hides the most and is the usual choice.

Look at the primed ceiling in daylight before you paint. If anything shows, call us back to touch it up. It is a short visit at that stage. Once the ceiling is painted, the room will look taller and take light better than it did.

Notes from the job

Do the whole floor if you can. Protection and cleanup are the bulk of the labor on a small popcorn job. Three rooms cost much less than three times one room. Hallways are worth including, since they connect everything and are the first ceiling a visitor sees.

Closets are easy to forget. A smooth bedroom ceiling next to a popcorn closet ceiling looks unfinished every time the door opens. They are small and quick to add.

Ceiling fans and heavy fixtures should be checked when they come down. If the box is loose or not rated for the weight, this is the time to have an electrician replace it. The ceiling is already open for work.

Smooth ceilings show more than textured ones did. That is the trade. Good flat paint and sensible lighting make them look their best. Avoid placing fixtures that throw light directly along the ceiling surface unless it has been finished to the highest level.

Before and after

After: Smooth finished ceiling with recessed lightsBefore: Popcorn texture mid-removal

Stock photos, shown to illustrate the result. Not one of our jobs.

Popcorn in the Falls

The big building years here were the 1960s through the 1980s. Nearly every ranch, split-level and colonial from that stretch got sprayed ceilings in at least the bedrooms and halls.

That same date range is why testing is step one on every job we do in the village.

Questions

Can I scrape it myself and have you finish?

You can, after a clean asbestos test. Be warned that a rough scrape makes the finishing harder. Go easy on the gouges.

Is covering it as good as removing it?

For the finished look, yes. You lose under half an inch of height and gain a brand-new surface.

How much mess should I expect?

Inside the plastic, a lot. Outside it, very little. That is the point of the plastic.

Do you paint the ceiling after?

No. It is left sanded and ready for primer.

Can you do vaulted ceilings?

Yes. Height adds time for staging and is priced in.

Need a price on popcorn ceiling removal?

Send the details. You get a written estimate back, free.

Get a free estimate

Estimate request

Free. Written. No obligation.

Room sizes, what happened, and your timing all help us give a realistic figure.

Up to 5 images, 10 MB each.

We use these details only to reply about your project.