Basement drywall installation in Menomonee Falls

Framed and wired is not finished. Drywall is what makes a basement a room.

Get a free estimate
Finished basement with smooth walls, soffits and recessed ceiling lights

The short of it

A basement is the hardest space in the house to drywall and the one where shortcuts show most. Low ceilings. Ducts everywhere. Concrete that stays cool and a little damp.

Done right, you get a room that looks like it was part of the original house. Done wrong, you get wavy soffits and moldy baseboards. The difference is planning.

What matters down there

Moisture. We use moisture-resistant board on outside walls and in bathrooms. All board stops short of the slab. If we see signs of past water, we tell you before covering it.

Soffits. Ducts and beams have to be boxed in. Straight, level boxes with clean corners are most of what makes a basement look professional.

Jobs we take

  • Full finish

    Whole lower level.

  • Partial

    One room, rest left open.

  • Redo

    Paneling or old tile ceiling replaced.

  • After water

    Lower walls rebuilt.

  • Hung, not finished

    We tape what someone else hung.

Sequence

  1. Verify

    Framing, rough-ins and inspections complete.

  2. Mark access

    Valves, cleanouts, junction boxes.

  3. Ceilings and soffits

    Hung first.

  4. Walls

    Half an inch off the floor.

  5. Finish

    Bead, tape, three coats, sand.

Choices

Ceiling: drywall or drop tile. Drywall gives more headroom and a better look. Tile gives access. Drywall with access panels gives you most of both.

Sound: if there will be a TV, a drum kit or teenagers, add insulation in the ceiling before the board goes up. It cannot be added after.

Result

  • Real rooms

    Flat walls, level ceilings.

  • Headroom kept

    Tight soffits.

  • Built for damp

    Right board, gap at the floor.

  • Serviceable

    Access where it is needed.

What the estimate lists

  • Walls and ceilings

    Square footage of each, listed by room.

  • Soffits

    Counted and measured separately. A long duct run with a beam beside it can be a large share of the job.

  • Board types

    Standard board for dry areas. Moisture-resistant in the bathroom and near the laundry or sump.

  • Corners and openings

    Number of outside corners needing bead, and number of doors and windows to wrap.

  • Finish

    Level and whether ceilings are smooth or lightly textured.

  • Access panels

    How many, and where.

  • Stocking

    Carrying board down the stairs, and whether sheet length is limited by the turn.

If framing, insulation or electrical are still in progress, the estimate assumes they will be complete and inspected before we start. If you want help lining up those trades, ask.

How the days run

For an average basement with a main room, a bedroom and a bath.

  1. Day one: stock and ceilings

    Board carried down and stacked flat. Ceiling sheets and soffit bottoms hung.

  2. Day two: walls and soffit sides

    Walls hung with the bottom edge off the slab. Soffit sides fitted. Corner bead on every outside corner.

  3. Day three: tape

    All joints and inside corners taped. First coat on bead and fasteners.

  4. Day four: second coat

    Dehumidifier running. Each coat must be fully dry before the next.

  5. Day five: third coat

    Widest coat. Butt joints and soffit corners get extra attention.

  6. Day six: sand and check

    Sanded with a light along every surface. Touch-ups. Cleaned out.

Damp weather can add a day between coats. A larger basement or a lot of soffit adds days at the hanging and taping stages.

What we need from you

A dry basement. If water has come in before, or the walls show white mineral deposits or damp patches after rain, that is dealt with first. Drywall does not solve a moisture problem. It hides it for a while and then fails.

Framing, wiring, plumbing and insulation complete, and inspected where the permit requires. Soffits framed around every duct, beam and drain. Once we hang, changes mean cutting board back out.

Access decided. Every shutoff valve, cleanout, sump connection and junction box needs to stay reachable. Walk the basement and mark each one. We fit panels or leave framed openings.

A clear stair and a flat place to stack. Measure the tightest turn at the bottom. If full-length sheets will not make it, we need to know before the order goes in.

A dehumidifier running, and the heat on. From the first coat to the last.

What can change the plan

Sheet length. If the stair will only take eight-foot board, there are more joints to tape and the finishing takes longer. We find this out at the estimate, not on delivery day.

Soffit changes. A duct that turns out lower than framed, or a pipe added after framing, means reworking a soffit. Small on its own. It adds up if there are several.

Ceiling decision. Switching from a suspended ceiling to drywall, or the other way, after framing changes the scope for us and for the electrician. Settle it early.

Damp weather. Below-grade air holds moisture. In a humid week a coat can take two days to dry even with a dehumidifier. The schedule stretches and the result does not suffer.

Mistakes we see in basements

  • Board on the slab

    It wicks moisture. Keep it up off the concrete and cover the gap with base.

  • Valves boxed in

    Every one needs a panel. You will need it on the worst possible day.

  • Finishing over a damp wall

    Fix the water first. Always.

  • One low ceiling for one duct

    Box the duct. Keep the height everywhere else.

  • No photos

    Photograph the open walls. It takes five minutes and saves holes later.

After we leave

Give the last coat several days with the dehumidifier on before priming. Then prime everything with a drywall primer and paint. Basements are lit from close range, so check the primed surfaces under your actual lights before the color goes on.

Keep the dehumidifier as a permanent fixture through the summer. Steady humidity is what keeps joints tight and paint sound below grade. Fit baseboard with a small gap above the floor finish, so a minor spill does not reach the board.

Notes from the job

Low ceilings and close lights are the reason basement finishes get criticized. A joint that would never be noticed upstairs shows under a recessed light two feet away. We finish basement ceilings with that in mind. If you want to keep costs down, a light texture on the ceiling is a reasonable choice here.

Steel beams and posts get wrapped. A beam is boxed with framing and board like any soffit. Posts can be framed square and boarded, which looks better and gives the corner bead something to fasten to. Decide before framing is finished.

Windows and window wells need care. The returns around a basement window are small pieces with four corners each. They take time out of proportion to their size. Moisture-resistant board is a good choice for them, since they see condensation in winter.

Stairwells are usually part of the job and are easy to leave out of the estimate. The walls on either side of the basement stair are tall and awkward to reach. Make sure they are on the list.

Sound from above travels. Insulation in the joist bays helps with voices and television. It does less for footsteps. If the room below will be a bedroom or a theater, say so before the ceiling is hung, and we can talk about thicker board or other measures.

Before and after

After: Finished basement with recessed lightingBefore: Drywall hung, joints unfinished

Stock photos, shown to illustrate the result. Not one of our jobs.

Falls basements

Full basements are standard in the village. Poured walls in most houses from the 1960s on. Block or stone in the older ones near downtown, which are often better left unfinished.

If your sump runs a lot in spring, sort out drainage before finishing. We would sooner lose the job than board over a wet wall.

Questions

Do you frame?

No. We start when framing, wiring, plumbing and insulation are done and inspected.

How do I get to a shut-off later?

Through an access panel. We place them before hanging.

Regular drywall or the green stuff?

Moisture-resistant on exterior walls and in baths. Regular is fine on interior partitions.

How low can the ceiling be?

Codes set a minimum finished height. If you are close, we plan soffits carefully to keep it.

Will it be dusty upstairs?

We seal the stairway and cover returns. It stays manageable.

Need a price on basement drywall installation?

Send the details. You get a written estimate back, free.

Get a free estimate

Estimate request

Free. Written. No obligation.

Room sizes, what happened, and your timing all help us give a realistic figure.

Up to 5 images, 10 MB each.

We use these details only to reply about your project.